Next Gen Atlas
- ROLE
- Lead UX Designer
- TIMELINE
- Aug 2026 – Oct 2026 2 MO
- TEAM
- Solo designer, with o9 product and solution leads as reviewers
- PLATFORM
- Web prototypes, desktop and phone
- ORG
- o9 Solutions
Context
A planning experience where every role works on the same plan, sees it drawn as a living map, and passes a decision to the next person inside the product, with every number able to say where it came from.
The Atlas was my answer to how o9’s next-generation planning experience should look and behave for planners: the situation drawn as a map you zoom into, rather than a report you read.
At a glance
- Problem
- Planners already have the parts they need: exceptions, scenarios, a solver, approvals, a post-game. They sit in separate grids and workspaces that people stitch together by hand. In the training exercise I studied, one demand signal takes 68 scripted training steps to reach a supply answer.
- My role
- Lead UX Designer, inside leadership’s next-gen brief. AI agents drafted the plans and built each prototype in code from my briefs; I approved, corrected or redirected their plans.
- How it works
- Fourteen roles share one plan. Each lands on its own Home with one next move. The Atlas draws the network at three zoom levels, a solver re-plans in the browser, and a request carries its answer back to whoever asked.
- Where it stands
- A concept prototype, not a shipped product and not o9’s roadmap. It works end to end in the browser and was audited against 739 requirements.
My part
- Researched the problem and synthesised four sources: a recorded session with a supply-planning expert, a customer’s training workshop, a demand-planning training manual and o9’s public product demo.
- Designed the flows and the interaction model: one shared plan with a landing per role, and a request that carries its answer back, inside the brief’s rule that AI proposes and a person decides.
- Did the visual and UI design, the network map’s look included: weighted lanes, and one meaning per hue.
- Made the case for the demand planner the brief had left out.
- Briefed and judged nine builds, each answering one question, and held each to the review gates that kept it honest.
My role and how the work ran
Led
- Research and its synthesis
- The flows and the interaction model
- The visual and UI design, the network map’s look included
- Every build’s brief, scope and verdict
- The decisions the plans put to me
- The case for the demand-planner seat
- Telling the work to leadership
Worked with
- AI coding agents drafting each plan and building each prototype in code from my briefs, with agent reviewers and a fixer every round
- o9 product and solution leads as reviewers
- Product leadership the next-gen direction, and the end-to-end question that reshaped the work
- A delivery team (build 23) a product manager, a solution architect, developers and testers, on the shortage flow and its handover
Problem
Planners already have the right parts. What fails is how the parts are put together, and who has to do the putting.
- 68 scripted training steps to turn one demand signal into a supply answer. Training exercise
- 8 presses for the same relay, walked live by a scripted run, with the answer back where the question was asked. The prototype
Three problems behind the numbers
- The parts exist; the assembly fails Scenarios, approvals, a solver, a process calendar, a post-game: spread over separate workspaces a planner has to stitch together.
- Context lives in filters, not in the work Which plan, which scenario, which scope: it sits in a long row of filter chips, so every hand-off starts by finding the same place again.
- A request travels as a letter In the exercise, a request leaves as a free-text task with no link to the scenario or the question it is about.
One more gap: the internal product brief did not yet cover the demand planner, who owns the one number every plan is built to. I made the case for the seat and a sixty-minute session guide to test eight hypotheses with planners, and the builds carried the seat as a hypothesis.
Six frictions on the way
- No immediate impact After a demand upside is typed into a grid, the outlook chart beside it does not move until a separate end-to-end run finishes.
- Tasks are letters A hand-off is a free-text task with no link to the scenario it is about, and one signal arrives as several near-duplicates.
- One process, three vocabularies The process map, the demand calendar and the supply calendar name the same cycle three ways, and none of them shows today.
- Decks assembled by hand A review slide is put together by hand across several surfaces, and the decision the meeting reaches is recorded nowhere.
- Coordination leaks out In the supply-planning session, triage happened in meetings, email and the ERP, and who did what in a scenario was hard to see.
- A wall of prose The first end-to-end reference build of the new direction (not mine) answered “end to end” with nine destinations, a More page and five text tabs per situation: complete, and a wall of prose.
The seat the brief left out
The internal product brief did not yet cover the demand planner, though the demand planner owns the one number every plan is built to. I made the case for the seat; it was written up in the brief’s own format, marked plainly as an unconfirmed extension, with a validation kit to test it with real planners: questions for the product team and a sixty-minute session guide that tests eight hypotheses. The first four:
- A demand planner’s day is set by the calendar, the inverse of the supply planner’s exception-driven day.
- Consensus disputes are settled outside the system, in meetings and email.
- Who moved which layer, by how much and on what evidence, is hidden.
- Accuracy review is a monthly post-game someone builds by hand.
Approach
How I worked
Evidence in, a brief out, then a running prototype every time. AI coding agents drafted each plan and built each prototype in code from my briefs, and my verdict on each build decided the next. Nine builds and a pitch in ten weeks, from a first map of a value chain to the whole platform for fourteen roles.
The model as the interface
A commit that never reached the plan; fixed.
What if the dashboard were a map?
A pitch: the dashboard read as one flow.
One place for a real shortage
Five screens of a shortage flow, one place.
Everything on
Leadership’s end-to-end question reshaped the work.
The answer is the map
A forecast-accuracy answer drawn as a map.
One canvas, end to end
3D tried and dropped; depth became a zoom.
A cascade across stages and seasons
Audited to 91 of 94 points, and still lost.
Calm, engineered
Calm as a measured system; colour came back.
The whole platform, one brain
Fourteen roles on one plan; the relay in 8 presses.
Research
| Source | What it gave | Its limit |
|---|---|---|
| A recorded session with a supply-planning expert | The exception loop, eight pain points, and the band planners actually aim for (96–98% on time against a 100% target): silence must mean safety. | One session, one role, on a demo setup. |
| A customer’s training workshop | The use cases and friction of today’s demand-to-supply flow; with o9’s process canon, 739 testable requirements for the build. | A training script, not observed use. |
| A demand-planning training manual | 13 demand use cases with the real measure names: value added by layer, touched share, assumptions as records. | A manual, not a planner. |
| o9’s public product demo | The agent roster, the card grammar of a situation and a set of disruption scenarios as raw material. | A sales demo: its figures are not facts. |
| Leadership’s product brief and reviews | The direction the Atlas worked within, and the question that reshaped it. | Direction from leadership, not my idea. |
How it evolved
Build 15
Aug 11–26
The model as the interface
- The question
- What if the planning model itself were the screen?
- What it proved
- A map of a value chain, situations drawn as weather, carried a governed working day across nine roles.
“looks very real-time — is this meaningful?”
Atul, on the scripted day - What changed
- A self-audit found that a commit wrote to the scoreboard, never to the plan; a real write path fixed it. An ambient day replaced the scripted clock.
Build 22
Aug 25 – Sep 3
What if the dashboard were a map?
- The question
- Can the planning dashboard read as one flow?
- What it proved
- A pitch, not a build: 12 numbers on the landing instead of about 40, every one reconciled to the dashboard.
- What changed
- The pitch proposed one map grammar for supply and planning reviews; later builds kept the grammar.
Build 23
Sep 4–7
One place for a real shortage
- The question
- Can a five-screen material-shortage flow become one place, with the same numbers?
- What it proved
- A red thread behind a frozen wall: the flow’s four pages became one canvas, and the side effect of each move was drawn before it was made.
- What changed
- I cut every feature the real flow did not have; the build was shared with engineering as a reference.
Build 24
Sep 7–8
Everything on
- The question
- What is a next-gen Atlas when zoom, scenarios, roles and signals are all on?
- What it proved
- One map at three zoom levels, a weekly engine, priced scenarios to compare, and four roles with a proposal gate.
- What changed
- Leadership saw it working for a narrow slice and asked how the Atlas would work end to end. That question set September’s work: from one polished scenario to a framework that holds any scenario.
Build 25 to 26
Sep 8–9
The answer is the map
- The question
- Can a demand expert’s forecast-accuracy conversation be read on a map instead of a scroll?
- What it proved
- An accuracy field showed planners cutting a strong system forecast; then a node map grew with each answer, its edges weighted by share of the miss.
“where to start?”
Atul, on the first cut - What changed
- Calm by default, then, after “plain and empty”, a map the conversation draws: nothing moves once placed, and what the data cannot answer is a node that says so.
Build 28
Sep 12–18
One canvas, end to end
- The question
- Can one canvas hold every kind of situation without bespoke code?
- What it proved
- State per case and levers as data. Nine destinations and a More page became six; five text tabs became four drawn lenses; a demand seat was added.
“Maybe stick to 2D view with different zoom levels, with progressive disclosure.”
Atul, after using the 3D views - What changed
- I had pushed for a three.js view. Both 3D views were built; once I used them I agreed they could not be read, and they were deleted the same day. Depth became a zoom (board, orbit, case), not an axis.
Build 29
Sep 21–29
A cascade across stages and seasons
- The question
- Can one market signal be followed through six planning stages and six seasons?
- What it proved
- One situation propagating through fourteen links, audited from 29 to 91 of 94 points.
“overwhelming and I was lost as a user.”
Atul, on the second scenario - What changed
- The diagnosis changed the measure: coverage now counts only what a role can reach, and a round that adds coverage and breaks a budget has failed.
Build 30
Sep 30 – Oct 6
Calm, engineered
- The question
- Can calm be a system that is measured, not a taste?
- What it proved
- Word budgets per screen and one primary per view. Its own 647-item audit found nothing missing (610 covered, 26 declared, 11 partial).
“This variant looks overwhelming … Atlas view also looks very clumsy.”
Atul, on the audited build - What changed
- A refinement round added a plain-word glossary and cut words at rest by a third to a half, then went too far into black and white; colour came back with one meaning per hue.
Build 32
Oct 7–21
The whole platform, one brain
- The question
- What do demand, supply, consensus and the planning review look like end to end, for every role?
- What it proved
- Fourteen roles on one plan, a solver in the browser, and the demand relay in 8 presses.
“I feel other variant of ATLAS prototype has better ATLAS view and interactions and ui and animations …”
Atul, on 18 Oct - What changed
- The Atlas took the earlier builds’ weighted, flowing lanes, cause-and-effect edges and camera zoom, while the chrome stayed calm.
Three architectures, scored
For the whole platform, the planning agents drew up three shapes for the same use cases and scored them on eight criteria before anything was built: coverage, realism, the Atlas as the heart, a next-gen feel, five-second calm, freedom from a script, feasibility, and how well it demos to leadership. I approved the plan’s pick, with the best of the other two grafted on: the month as the planning thread, and the network as the shared drawing.
| Architecture | What it did best | What it cost |
|---|---|---|
| 62A cycle atlas: the month as the spine | The strongest picture for an operations lead: the plan travelling through four review gates. | It read like a guided walk, which earlier builds had shown to fail. |
| 61One network: the map as the whole product | The purest Atlas: every case a place on one drawing. | Demand and consensus work is indirect on a map, and lens × zoom × role multiplies what has to stay calm. |
| 67One brain, many postures: one plan, a landing per role (chosen) | Closest to what the earlier builds proved: one shared plan, each role on its own Home and inbox, the Atlas shared. | Fourteen landings to keep calm, so six roles sit one menu away. |
Principles as gates
“Calm” and “honest” were not left to taste. Each principle became a number a meter could check in every round, at both widths and in both themes.
| Principle | The gate |
|---|---|
| One thing at rest | One filled primary per view. Home ≤ 88 words above the fold; the Atlas at rest ≤ 60 words and no figures on the map. |
| Plain words | 0 internal codes on screen, checked on 3,864 pages (every role, route, width and theme) by a vocabulary gate. |
| Calm is not monochrome | At most three subject hues, one meaning each: hue says whose units, red says late or short (one or two places a screen), gold says out of bounds. |
| Readable by construction | Marks ≥ 3:1 and text ≥ 4.5:1, measured by painting the pixel; labels ≥ 11 px at 1440 and 375; at 375 a drawing reflows, never scales. |
| Never a tour | 0 Next buttons, pagers or step counters. A presenter opens live places; the product does not perform a script. |
| Honest numbers | Every figure says where it came from, and AI’s words are marked as AI’s. No number comes from the language model. |
Key decisions
-
One plan, a landing per role
Fourteen roles work on one plan. Each lands on its own Home with one next move, its own inbox of signals (Pulse) and its own rights; nobody works on a copy.
- Trade-off
- Fourteen landings to keep calm. Six roles sit one menu away to protect the five-second test.
-
Draw the work, don’t write it
The network is one flat map at three zoom levels: network, place, chain. Couplings between cases are edges with a verb.
- Trade-off
- A map needs a budget too: at most 60 words at rest and a cap on the edges a selection draws, so it does not turn into a hairball.
-
The answer comes back
A request carries its what-if, figures, scope and deadline. The reply is written onto the requester’s case and into their Home sentence.
- Trade-off
- Two people, two acts: the requester never approves their own ask, so a relay always crosses from one role to another.
-
Numbers from the engine, words from the model
Ask matches what you meant with a small sentence-embedding model that runs in the browser; every number comes from the engine. AI’s words are marked as AI’s.
- Trade-off
- Narrower answers: when unsure it offers “Did you mean…” with three choices instead of guessing.
Seven decisions
-
One plan, a landing per role
Fourteen roles work on one plan. Each lands on its own Home with one next move, its own inbox of signals (Pulse) and its own rights; nobody works on a copy.
- Why
- A role has to change the landing, not just the header, and a hand-off only closes when both people read the same record.
- Trade-off
- Fourteen landings to keep calm. Six roles sit one menu away to protect the five-second test.
-
Draw the work, don’t write it
The network is one flat map at three zoom levels: network, place, chain. Couplings between cases are edges with a verb.
- Why
- A 3D field was built and failed the only test that matters: you could not read it. Perspective shortens exactly the axis a planner reads.
- Trade-off
- A map needs a budget too: at most 60 words at rest and a cap on the edges a selection draws, so it does not turn into a hairball.
-
The answer comes back
A request carries its what-if, figures, scope and deadline. The reply is written onto the requester’s case and into their Home sentence.
- Why
- An answer that lands anywhere but on the request leaves the asker to go and find it, and the next person starts from nothing.
- Trade-off
- Two people, two acts: the requester never approves their own ask, so a relay always crosses from one role to another.
-
The solver suggests; a person signs
A solver re-plans in the browser in a fraction of a second, but a change that needs sign-off only ever arrives as a proposal to the person who signs it. Approving and carrying out are two acts by two people.
- Why
- A data load or a weekly re-plan must never quietly change a decision someone signed. (Proposed by the build agents’ review; I accepted it.)
- Trade-off
- The solver may find a better value and still waits for its signature; three of its inputs are shown as assumptions to confirm.
-
Consensus as authored layers
Each layer of the forecast keeps its author, assumption and value added. An edit writes a new layer and never overwrites one; who moved the number is one press away.
- Why
- A consensus dispute starts with who changed what, by how much, on what evidence, and the training material shows value added only as totals, with no rows or authors. (That planners lack this is one of the seat’s eight hypotheses.)
- Trade-off
- More history on screen. The grid stays the editor; the layers are the record, and trusting the system is a priced what-if, never a change.
-
Numbers from the engine, words from the model
Ask matches what you meant with a small sentence-embedding model that runs in the browser; every number comes from the engine. AI’s words are marked as AI’s.
- Why
- Marking every widget as AI makes AI the default instead of the exception; marking only what the model wrote keeps it legible.
- Trade-off
- Narrower answers: when unsure it offers “Did you mean…” with three choices instead of guessing.
-
Two losses, not one score
When a demand planner sizes an account’s override, accuracy and the money it costs to be wrong are priced separately for every option, even though their best settings disagree.
- Why
- One blended score would hide that the cheapest setting breaks the forecast guardrail. (The engine came from the build agents after I asked whether demand planning was covered.)
- Trade-off
- Two measures to weigh instead of one answer, and a recommendation that clears one gate can still escalate at the other.
The Atlas: drawn, not written
The network is the one drawing every role shares. Lanes are weighted by the units they carry, and particles flow along the heaviest ones in the direction of supply.
- Canada
- Europe
- Supply
- Short
- Capacity
- Stock
- ✓Resolved
- Supplier
- Plant
- Hub
- Warehouse
- Customer group
Arrow keys move between places and cases; Enter opens one; Escape goes back. Plus and minus zoom, 0 fits the map, Shift with an arrow pans. Ctrl with the wheel, or a pinch, zooms; once the map has focus, the wheel alone does. Z unfolds the chain behind line 1 into weeks, and folds it back.
- Places. suppliers: Supplier 1, Supplier 2; plants: Eastbrook · connector, Southvale · line 1; hubs: Midhaven · hub; warehouses: Canada North, Germany North, Germany South, Europe central, Europe regional; customer groups: Canada, Europe · Online, Wholesale, Retail.
- Lanes, in the direction of supply. Supplier 1 to Eastbrook, flow meters, heavy; Supplier 2 to Southvale, level gauges, medium; Eastbrook to Europe central, flow meters, heavy; Southvale to Midhaven, level gauges, heavy; Midhaven to Canada North, level gauges, heavy; Midhaven to Germany North, level gauges, light; Midhaven to Germany South, level gauges, light; Canada North to Canada, level gauges, heavy; Europe central to Europe · Online, flow meters, medium; Europe central to Wholesale, flow meters, medium; Europe central to Europe regional, flow meters, light; Europe regional to Retail, flow meters, light.
- Cases. Shortage at Eastbrook: Connector arriving late from Supplier 1 (Flow meters · supply is on it · no customer short); Capacity at Southvale: Line 1 runs close to its limit (up to 96 of 99 hours a week · near full most weeks); Stock at Midhaven: Midhaven holds a buffer for Germany (Germany North and South · weeks of cover).
The Atlas, live
Switch the lens to Marc’s what-if (Marc is the demand manager) to watch the plan solve. Point at a place to light its path; select a case to see what it starves, feeds and triggers; open a place, or unfold line 1’s chain into weeks. Pinch to zoom, or use the wheel once the map has focus; drag to pan. Every gesture has a key: arrows, Enter, Esc, + − 0 and Z.
Who moved the number
A consensus number is a stack of human judgements on top of the system’s forecast.
Who moved the number Canada · level gauges · Sep–Dec
- System forecast The demand agent37,420
- Sales The sales team−245
- Management Marc Hoffmann+7,436
- Consensus The one number37,175, 44,611 with the what-if
Management Marc Hoffmann
- Assumption
- Canada upside, +20 % on consensus, Sep–Dec
- Units, Sep–Dec
- +7,436
- Accuracy added, Apr–Jun
- No score yet
- Status
- In a what-if, not the plan
Totals over Sep–Dec: the bridge cannot say in which month a layer moves the number. The axis does not start at zero, so the totals are drawn broken at their root.
| Layer | Author | Assumption | Units, Sep–Dec | Accuracy, or accuracy added, Apr–Jun |
|---|---|---|---|---|
| System forecast | The demand agent | Where every layer starts | 37,420 | 83.1% |
| Sales | The sales team | One order moves to January | −245 | −1.5 points |
| Management | Marc Hoffmann | Canada upside, +20 % on consensus, Sep–Dec | +7,436 | No score yet |
| Consensus | The one number | The system forecast plus every layer | 37,175, 44,611 with the what-if | 81.6% |
Keys: Tab or the Up and Down arrows reach each layer, and its author, assumption, value and accuracy added show beside the bridge; Left and Right switch between units and accuracy added.
Layers, by author, and what each one added
Point at a layer for its author and its assumption, or switch to Accuracy added for what each layer did to accuracy; changes are signed, never red or green.
The forecast room
Post-game accuracy lives in a room of its own, on its own clock, so its figures never sit on this month’s charts. A statistical challenger backtests simple methods against the system forecast, and on six months of history it refuses to choose: “Too little history to choose a method.” Adopting a method for a segment is a governed act: the demand analyst may sign alone up to a small share of volume, and more goes to the planner.
Accuracy against money
In the earlier chassis build, a demand planner sizes how much of an account’s override to publish. The build recommends the accuracy best inside the forecast guardrail. Accuracy peaks at 62% of the override, money at 70%, and the cheaper setting breaks the 6% guardrail.
Accept 62%: accuracy +0.77 pts · published +5.94% over the system forecast · write-down $222K · margin forgone $342K · over the guardrail
| Share accepted | Accuracy added | Published above the system forecast | Write-down | Margin forgone | Cost of being wrong | Over the 6% guardrail | Marked |
|---|---|---|---|---|---|---|---|
| 0% | 0.00 pts | 0.00% | $0 | $2.1M | $2.1M | No | System forecast |
| 10% | +0.23 pts | +0.96% | $29 | $1.8M | $1.8M | No | |
| 20% | +0.41 pts | +1.92% | $738 | $1.4M | $1.4M | No | |
| 30% | +0.56 pts | +2.88% | $8K | $1.1M | $1.1M | No | |
| 35% | +0.62 pts | +3.35% | $20K | $957K | $977K | No | A third |
| 40% | +0.67 pts | +3.83% | $41K | $817K | $858K | No | |
| 50% | +0.74 pts | +4.79% | $108K | $577K | $685K | No | |
| 60% | +0.77 pts | +5.75% | $201K | $377K | $578K | No | |
| 62% | +0.77 pts | +5.94% | $222K | $342K | $564K | No | The record; accuracy best |
| 63% | +0.77 pts | +6.04% | $233K | $325K | $558K | Yes | first share over the 6% guardrail |
| 70% | +0.76 pts | +6.71% | $319K | $217K | $537K | Yes | money best |
| 80% | +0.70 pts | +7.67% | $470K | $106K | $576K | Yes | |
| 90% | +0.61 pts | +8.63% | $652K | $42K | $694K | Yes | |
| 100% | +0.48 pts | +9.58% | $856K | $14K | $869K | Yes | In full |
| Option | Accepted | Carry | Accuracy added | Above the system forecast | Write-down | Margin forgone | Approval, as the prototype routes it |
|---|---|---|---|---|---|---|---|
| Publish the System Forecast | 0% | None | 0.00 pts | 0.00% | $0 | $2.1M | None |
| Accept a third | 35% | 6 weeks | +0.62 pts | +3.35% | $20K | $957K | Supply Planner |
| Accept the recorded realisation | 62% | 6 weeks | +0.77 pts | +5.94% | $222K | $342K | Finance Partner |
| Let the assumption ride | 62% | 13 weeks | +0.35 pts | +5.94% | $750K | $1.2M | Executive |
| Accept the account layer in full | 100% | 6 weeks | +0.48 pts | +9.58% | $856K | $14K | Executive |
Let the assumption ride accepts 62% but carries it for 13 weeks, not 6, so it is not on these curves.
The AI contract
| Moment | What the person sees | Why |
|---|---|---|
| A signal arrives | One line in the inbox: sales booked an upside in Canada, and nothing is typed yet. | The agent senses; the person decides what to type. |
| Typing a what-if | It is read back for a confirm; Run it solves it in under a second, drawn dashed, “in your what-if”, with Undo. | A what-if is never the plan. |
| A recommendation | One recommendation, priced, with “Why not this option?” on every other column. | The system sorts; the planner decides. |
| Make it the plan | A before-and-after receipt and one Undo, written to the ledger with who and when. | Every act is reversible by the person who made it. |
| Asking a question | AI’s words marked as AI’s, figures from the engine, and “Did you mean…” when the intent is unclear. | No figure comes from the language model. |
| New data lands | The plan re-solves; anything that needs a signature becomes a proposal to the person who signs it. | Nothing anyone signed changes silently. |
| Reading the model | What the prototype does not claim, and three solver inputs listed as assumptions to confirm. | A demo has to say where it is a demo. |
Marc HoffmannDays of stok at Canda Nort?
Did you mean…
Not sureI don’t know “Canda Nort”. The nearest readings, by the plan’s place, product, measure and option names:
Try one, or type your own
Ask, when it is not sure
Type a question, or a misspelt one.
Assumptions to confirm
Inputs the scenario never states; in the prototype, changing one re-solves the plan.
- Supplier 2’s truck lead time
- 1 week ◦ demo
- Midhaven’s level gauges free to move
- 1,287 units ◦ demo
- How far ahead line 1 may build
- 0 weeks ◦ demo
What it does not claim
- No sign-in: anyone at this address takes any seat.
- No connection to the company’s planning systems.
- After a load, the system forecast is a stand-in, not a new forecast run.
- The solver is an open-source one, not the production planning engine.
- The prototype sends nothing: files are read and kept in this browser.
What it does not claim
The prototype’s own list, open on its Model page.
Constraints
- Today’s planners first A case opens on the four steps planners are trained on, and the bars-against-100% charts they know are kept. A new lens always has a way back to the grid.
- Honest inside a demo Three solver inputs the scenario never states are shown as assumptions to confirm rather than facts.
- One browser, nothing sent The solver runs in WebAssembly and Ask’s model runs locally: no request leaves the machine.
- Calm for a first-time viewer A leader who has never seen the platform should name the next move in five seconds, in plain words.
Outcome
The demand relay, end to end
Sales book an upside in Canada for the coming months. The demand manager tries it, asks supply, and gets an answer written back, without leaving the product.
| Way | Count | Detail |
|---|---|---|
| Today, as the workshop teaches it | 68 numbered instruction steps | As the training script prints it. |
| Next gen, as the prototype walks it | 8 presses; 2 role switches not counted | Demand Manager: presses 1–4; Supply Manager: presses 5–7; Demand Manager: press 8; the answer is written back. |
Build 32 walked this relay live in October. In November I briefed its North Star version for this page, and AI agents built it: eight presses across the same two seats, with every screen carrying its numbers.
Arrows move along the stops and the window’s tabs; Home and End go to the first and last. Escape closes a Why read or the thread. A pointer, a key or a focus in the window stops Play.
Good morning, Marc.
One signal waits on you today: sales booked an upside in Canada. Next: Demand review, 12 Jul.
- Demand served100.00%Weekly, Jul–Dec.Level gauges · Jul–Dec
- Revenue at risk$2.1kWeekly, Jul–Dec.All products · Jul–Dec
- Days of stock11 daysWeekly, Jul–Dec.Canada North · lowest ahead
- Forecast accuracy81.6%Monthly, Jan–Jun: 78.9, 80.2, 79.5, 81, 82.3, 81.6.By item · Apr–Jun
Canada · level gauges units a month
- Consensus
- System forecast
- P10–P90 band
- Sold
| Month | System forecast | P10–P90 | Consensus | Sold |
|---|---|---|---|---|
| May | 9,120 | 8,938–9,302 | 9,060 | 9,180 |
| Jun | 9,260 | 8,982–9,538 | 9,230 | 9,420 |
| Jul | 9,210 | 8,750–9,671 | 9,180 | — |
| Aug | 9,280 | 8,723–9,837 | 9,240 | — |
| Sep | 9,300 | 8,649–9,951 | 9,240 | — |
| Oct | 9,370 | 8,620–10,120 | 9,310 | — |
| Nov | 9,340 | 8,499–10,181 | 9,280 | — |
| Dec | 9,410 | 8,469–10,351 | 9,345 | — |
Keys: the arrows move by month, Home and End jump to May and December, Escape hides the reading.
- System forecast The demand agent37,420
- Sales The sales team−245
- Management Marc Hoffmannnone
- Consensus The one number37,175
Sep–Dec totals by layer; no management layer until a what-if runs. The axis does not start at zero.
Your move
Canada upside: can we supply it?
+7,436 · level gauges, Canada
Spotted
Flagged at 09:00 · not planned yet
Booked upside
Sales · bookedSales booked an upside for Canada. It is not in the plan yet.
- +7,436 level gauges, Canada
- Morning · Marc Marc’s Home at nine: four measures, the Canada forecast, and one signal the assistant flags.
- Press 1 of 8 · Marc · Try it in a what-if The assistant reads the booked upside as a what-if: what, where and when, for Marc to confirm before anything runs.
- Press 2 of 8 · Marc · Run it It solves live on the Atlas: line 1 fills partway through the plan, and Canada customers run short soon after, in the what-if only.
- Press 3 of 8 · Marc · Ask Lukas The request is prefilled with the question, the what-if, its scope and a deadline.
- Press 4 of 8 · Marc · Send · now Lukas’s Home Sent with one Undo; the question is first in Lukas’s inbox, with the what-if attached.
- Press 5 of 8 · Lukas · Reply to Marc Line 1’s weekly hours against its limit, with the flex shift drawn where it would go.
- Press 6 of 8 · Lukas · Compare options Four options run side by side, each priced, under one recommendation.
- Press 7 of 8 · Lukas · Make it the plan · then Marc’s Home One act with one Undo: the map re-solves, and Marc’s Home sentence becomes Lukas’s answer.
- Press 8 of 8 · Marc · Carry out The upside goes into the plan, and Marc’s numbers show before and after.
The demand relay in 8 presses, playable
Press Next, or Play, or make each press in the window yourself. Every stop is the whole app: switch tabs, scrub the charts, pivot the options, ask the assistant. The Phone switch shows the same relay at 390 px.
Where it stands
- 8 presses for the demand relay, walked live by a scripted run.
- 739 requirements from the workshop and o9’s process canon, audited: 674 covered, 65 declared out of scope, none missing.
- 27 of 27 press targets met on the final live walk (a target is the most presses a task may take).
The demand-planner session ran, and planners confirmed most of the eight hypotheses.
Next: measure the prototype with planners, signal by signal.
How success would be measured
None of these signals has been measured yet, so this is the plan results would be read against.
| Signal | Today | How it is read | Aim |
|---|---|---|---|
| Steps from a demand signal to a supply answer | 68 scripted training steps (the workshop’s script) | Planners walk the same exercise, unaided, in both | 8 presses or fewer, with the answer written back |
| Requests whose answer is written back | No baseline in the workshop | Count across a cycle’s hand-offs | Every hand-off |
| Time from signal to decision | Not measured today | Median and open tail, from the signal’s time to the signature | Baseline first in the first sessions, then a target |
| Value added by each forecast layer | Totals only, with no rows or authors | Value added per layer and author, per cycle | Shown for every layer, by author |
| First-time comprehension | None yet (a new measure) | A five-second test with first-time viewers | A planner names the next move in five seconds |
What travelled beyond the builds
- The seat the brief left out Three later builds carried it, as a hypothesis.
- Shared with engineering Early builds were shared with engineering as references.
- Told to leadership Two decks: the next-gen story with every figure’s source on the slide, and a proposal to shorten design iterations.
Learnings
-
A build can pass its audit and fail its reader
One build had nothing missing in its own 647-item audit, and I still found it overwhelming. Coverage now counts only what a role can reach, and every round is gated by budgets as well as by coverage.
From How it evolved -
With AI builders, the gate is the design
When agents write the code and draft the plans, the brief and the review gates are where the design lives: budgets, meters and live press walks. And stop verification loops sooner: working software first, audit documents after.
From How I worked -
Next time
Put planners in front of it first
Apart from leadership’s comments, which I relayed, and o9’s product and solution leads as reviewers, every review of the builds was mine or an AI reviewer playing a role.
From How success would be measured
-
A build can pass its audit and fail its reader
One build had nothing missing in its own 647-item audit, and I still found it overwhelming. Coverage now counts only what a role can reach, and every round is gated by budgets as well as by coverage.
From How it evolved -
Overwhelming is fixed by disclosure, not by cutting
When a build overwhelmed, the first instinct was to cut capability. What worked was keeping everything reachable and showing one thing at rest.
From Principles as gates -
Calm must not freeze the map
Subtraction twice drained the colour and the motion that carry meaning. Calm belongs to the chrome; the map stays alive, weighted and moving.
From The Atlas -
Depth is a zoom, not an axis
The 3D view looked futuristic and could not be read. Three flat zoom levels, each disclosing more of the same record in place, did what depth promised.
From How it evolved -
Never assert agreement; derive it
In an earlier persona prototype, a card said a plan was “signed by all five postures”. Once agreement was computed instead of written, that was wrong in 12 of 13 scenarios. A decision that records its dissent is stronger than one that hides it.
From Who moved the number -
With AI builders, the gate is the design
When agents write the code and draft the plans, the brief and the review gates are where the design lives: budgets, meters and live press walks. And stop verification loops sooner: working software first, audit documents after.
From How I worked -
Next time
Put planners in front of it first
Apart from leadership’s comments, which I relayed, and o9’s product and solution leads as reviewers, every review of the builds was mine or an AI reviewer playing a role.
From How success would be measured